搡老女人多毛老妇女中国,日韩亚洲欧美中文高清在线,人妻少妇一区二区三区,色妞色综合久久夜夜,日本熟妇xxxx

Your Good Partner in Biology Research

Recombinant Wuchereria bancrofti Putative serine protease inhibitor

In Stock
  • 中文名稱:
    班克羅夫氏絲蟲假定絲氨酸蛋白酶抑制劑重組蛋白
  • 貨號:
    CSB-EP2118WBS
  • 規(guī)格:
    ¥2328
  • 圖片:
    • (Tris-Glycine gel) Discontinuous SDS-PAGE (reduced) with 5% enrichment gel and 15% separation gel.
    • Based on the SEQUEST from database of E.coli host and target protein, the LC-MS/MS Analysis result of CSB-EP2118WBS could indicate that this peptide derived from E.coli-expressed Wuchereria bancrofti wb123.
    • Based on the SEQUEST from database of E.coli host and target protein, the LC-MS/MS Analysis result of CSB-EP2118WBS could indicate that this peptide derived from E.coli-expressed Wuchereria bancrofti wb123.
  • 其他:

產(chǎn)品詳情

  • 純度:
    Greater than 90% as determined by SDS-PAGE.
  • Uniprot No.:
  • 種屬:
    Wuchereria bancrofti
  • 蛋白長度:
    Full Length
  • 來源:
    E.coli
  • 分子量:
    62.3kDa
  • 表達區(qū)域:
    1-371aa
  • 氨基酸序列
    ILGQISLTDRAQLDFAVNLLQNVAESDRSSILSPFSVSTSLFIAYLAADGETKQQLQNALGKTASTSQFRIHFAKQLAYLARAESRNYTLNVANRFYVREEFSTKESFQRVLSFYYNEILYKFNFEQRNELVQEINDWVSNETNNKVTKMITENSITEDTRMLLMNAIHFKGTWTTQFIDFVTKQKQFHISENEVKLVPMMAKSDTVPYYEDDVVKVIKLPYTGGEVEMVVILPKRRFGLSDVLKNLSGEKLLKYVNEAKNRTVSIRMPRFQVEEKRNLNNALQAIGITDAFSGKADFGELLNNSIPISIGKIIHAGFIEVNEKGTESAAATLIELEDRMASSRNFNADEPFLFAIVKDLKTVLFIGQFVK
    Note: The complete sequence may include tag sequence, target protein sequence, linker sequence and extra sequence that is translated with the protein sequence for the purpose(s) of secretion, stability, solubility, etc.
    If the exact amino acid sequence of this recombinant protein is critical to your application, please explicitly request the full and complete sequence of this protein before ordering.
  • 蛋白標簽:
    N-terminal 10xHis-SUMO-tagged and C-terminal Myc-tagged
  • 產(chǎn)品提供形式:
    Liquid or Lyophilized powder
    Note: We will preferentially ship the format that we have in stock, however, if you have any special requirement for the format, please remark your requirement when placing the order, we will prepare according to your demand.
  • 緩沖液:
    If the delivery form is liquid, the default storage buffer is Tris/PBS-based buffer, 5%-50% glycerol.
    Note: If you have any special requirement for the glycerol content, please remark when you place the order.
    If the delivery form is lyophilized powder, the buffer before lyophilization is Tris/PBS-based buffer, 6% Trehalose.
  • 儲存條件:
    Store at -20°C/-80°C upon receipt, aliquoting is necessary for mutiple use. Avoid repeated freeze-thaw cycles.
  • 保質(zhì)期:
    The shelf life is related to many factors, storage state, buffer ingredients, storage temperature and the stability of the protein itself.
    Generally, the shelf life of liquid form is 6 months at -20°C/-80°C. The shelf life of lyophilized form is 12 months at -20°C/-80°C.
  • 貨期:
    3-7 business days
  • 注意事項:
    Repeated freezing and thawing is not recommended. Store working aliquots at 4°C for up to one week.
  • Datasheet & COA:
    Please contact us to get it.

產(chǎn)品評價